A customer outside Spokane called me three weeks after his 40x60 shop went up, asking why the shelf brackets he bought would not reach a stud. There are no studs.

Z shaped steel purlins bolted across red iron rafters on a partly clad metal building, with wall girts visible below the eave

A customer outside Spokane called me three weeks after his 40x60 shop went up, asking why the shelf brackets he bought would not reach a stud. There are no studs. His walls hang on girts, the Z shaped horizontal members bolted to the outside face of the columns, and on his building they sit 7 feet 6 inches apart from the base angle to the eave. A 55 inch television, a bench grinder, and two runs of 16 inch deep shelving all had to be planned around three horizontal lines, not around the 16 inch stud layout he had in his head from framing a house.

I get that call maybe a dozen times a year. Purlin and girt spacing sits on page two of the shop drawings as a dimension string nobody reads, and it quietly decides where you can hang weight, how much insulation fits, and whether the roof panel oil cans in July heat. It is also the number owners most want to change after the steel is already strapped to the trailer, which is the worst possible moment to ask.

What the spacing on your drawings actually says

Open the roof framing plan first. Purlins are the Z shaped members that run frame to frame across the roof, and each line carries a dimension. On rigid frame kits from the larger fabricators they land between 4 feet and 5 feet on center. Five feet is the default. Four feet shows up when the snow load climbs past roughly 40 psf, or when someone specified a heavier panel profile at the eave.

Now look at the sidewall elevation. Girts are the same Z profile turned sideways, and the spacing is wider because wind pressure on a wall is a gentler load than snow sitting on a roof for six weeks. Seven feet six inches on center is common on a 14 foot eave, which gives you one girt at 7 feet 6 inches, the eave strut above it, and the base angle anchored at the slab. Exposed sites and walls over 16 feet often drop to 6 feet on center instead.

The eave strut is neither a girt nor a purlin. It is the member at the corner that picks up both the roof panel and the top of the wall panel, and it is usually a heavier section than either one. Crews who treat it as just another girt end up with a wavy eave line, and that line shows in every photo anyone ever takes of the building.

Why 5 feet is not an arbitrary number

Spacing gets back calculated from the panel, not picked for convenience. A 26 gauge through fastened panel in a 30 psf ground snow zone spans about 5 feet while staying inside the deflection limit the panel manufacturer publishes. Stretch it to 6 feet and the steel still holds the load, but it flexes enough between supports that water lingers at the sidelaps and the fasteners back out over ten or fifteen years of thermal movement.

Go the other way and the math stops paying. Dropping from 5 feet to 4 feet on a 60 foot long building adds three purlin lines per bay, which on a six bay job is eighteen extra pieces to hoist, align, and bolt, plus roughly 400 more roof screws. On the kits I have erected, that is close to a full extra day of crew time and somewhere near $900 to $1,400 in labor and hardware, for stiffness nobody will ever feel.

MemberTypical spacingWhat sets itWhat widening it costs you
Roof purlin, snow under 30 psf5 ft 0 inPanel deflection limitPonding at laps, loose screws
Roof purlin, snow 40 psf and up4 ft 0 in to 4 ft 6 inSnow and drift loadPermanent panel deformation
Sidewall girt, 14 ft eave7 ft 6 inWind pressure and panel spanVisible waviness in the wall
Sidewall girt, exposed site6 ft 0 inWind zone and eave heightFastener fatigue at the laps
Liner panel backing4 ft 0 in or blockingInterior finish, not structureDented liner at knee height

One detail that catches people: the top and bottom spaces in a wall are almost never equal to the middle one. The fabricator fills the leftover dimension at the base, so a 14 foot wall might read 7 feet 6 inches, then 6 feet 6 inches down to the base angle. Measure from the drawing, not from the first dimension you see.

The advice I argue with: just add purlins

Online forums are full of people telling first time buyers to order extra purlins because more supports means a stronger roof. I have watched that go wrong enough times to push back on it.

Extra purlins without a revised stamped drawing do nothing for your permit, and they do nothing for the failure mode that actually shows up. Through fastened roofs rarely fail in the panel field. They fail at the fastener, at the sidelap, and at the connection clip where the purlin bolts to the rafter. Adding a purlin line between two existing ones leaves the clip pattern and the rafter unchanged, so the load path is the same load path. Worse, the new line often sits at a dimension that does not match the panel rib layout, so the crew drives screws at a slightly different spacing and the eye picks up the irregularity from the driveway.

If your real worry is snow, the honest fix is a panel change, a heavier purlin gauge, or a reduced frame spacing, and all three need the engineer who stamped the drawing to sign off. That revision usually costs $250 to $600 and takes a week or two. I have never regretted paying it. I have regretted bolting up field invented framing exactly once, on a job in 2021 where the inspector made us pull the panel back off to show him the clips.

The exception is bracing, not purlins. If you are hanging a hoist, a mezzanine, or a ductwork run, the right answer is usually a short piece of channel welded or bolted between two existing purlins, designed for that one point load. That is a local reinforcement, which is a different conversation than changing the building spacing.

Bypass girts, flush girts, and what you lose inside

Girts come two ways and the drawing will say which. Bypass girts run continuously past the outside face of the columns, which keeps the girt line straight and the panel flat, and it leaves you a cavity about 8 inches deep for insulation. Flush girts sit between the columns, with the outer flange level with the column face, so the inside wall is smooth and you lose the cavity.

For a shop, bypass wins almost every time. The deeper cavity takes R-19 or R-25 batt insulation without compression, the panel sidelaps land on a continuous line, and the crew can set a whole wall of girts without fighting a clip at each end. Flush girts earn their place when you want a liner panel tight against the column line for a commercial finish, or when a setback measurement is so tight that 8 inches of wall thickness matters to the permit.

Insulation depth is where spacing and material choice collide, and the batt you can fit matters more than most brochures admit. The breakdown in our look at insulation choices for steel buildings walks through what actually fits in each cavity depth.

What to check before the order goes in

Mark your mounting lines on the elevation. Before you approve drawings, draw where the hoist, the air lines, the shelving, and the electrical panel go. If a girt lands 14 inches below the hoist beam, ask the fabricator to shift the girt line now, while it costs nothing but an email.

Ask for the panel span table in writing. Any reputable supplier can send a single page showing allowable spans for the panel and gauge you bought, at the load in your zone. If they will not send it, that tells you something about the kit.

Confirm bypass or flush on the quote. It is one word on a line item, and switching after fabrication means new clips, new girt lengths, and a four to six week delay. Confirm the panel profile at the same time, because the purlin spacing and the profile are a matched pair. Our comparison of the PBR and R panel profiles explains which one tolerates a wider span.

Count the pieces against the plan at delivery. Purlins and girts look identical on the truck and they are frequently different lengths by a few inches. Sort them by stamped mark number on the ground before anything goes up. On a 60 foot building, finding one short girt after the panel is on costs a half day.

If you only do one thing from this piece, do the first one. Nearly every spacing complaint I hear traces back to an owner who approved drawings without once imagining what would hang on the wall. The rest of the specs on that page are covered across our materials and specs section, but the mounting lines are yours alone to decide.

FAQ

Can I drill into a girt to hang shelving?

Yes, into the web of the girt with a self drilling fastener rated for the load, and keep it off the flanges where the panel screws land. For anything over about 100 pounds per bracket, bolt through with a backing plate instead. Heavy point loads belong on the column line or on added blocking, not on a girt web.

What is standard purlin spacing for a metal building?

Five feet on center is the most common figure in the United States for rigid frame buildings with 26 gauge roof panel. Spacing tightens to 4 feet or so in high snow regions and can open up slightly with a heavier standing seam system that carries load differently.

Do girt spacing and insulation thickness have to match?

Not exactly, but they interact. Batt insulation is sized to the cavity depth created by the girt profile, usually 8 inches on a bypass wall, while the horizontal spacing mostly affects how the facing is supported and whether it sags between lines. Wider spacing means more visible sag in an unsupported facing.

Can purlin spacing change after the building is up?

Adding localized reinforcement for a specific load is routine and your engineer can design it in a day. Changing the spacing across a whole roof plane means pulling the panel, which turns into a reroof. Nobody does that voluntarily, which is why the drawing review stage matters so much.

DH
Dax Holloway

Dax has bolted up kits on sites from frozen Montana ground to Georgia clay, and he still walks every job before he writes about it. He writes about kits and use cases the way he would explain a job to the crew standing next to him.

More posts by Dax

More in Materials and Specs

01doorganico 084goad 3hot8 4465456 after5internprogram ahandfulofblessings ahmadpc ahomcybersecurity allodialresources annodex antiquesandperiodcollectibles aotc asianworldkashmir beedlectrics bloggertemplatefree bluefeatheragency bodyweightsolution campaign08blog carfixadvisor catstreetcollective cbstvsports cnfanspurchasing committeeof500yearsofdignityandresistance covertopsdjs cs-kaiyuangame cuestacomunicaciontotal cxoutlet dancebetgame deskgearhub destinyvillastay detectmagazine di33 donmo dyanadropship emarsysfinance emimattl escapechan eskitarih evautoplay everythingweddings-orlando farmzone feedviewerapp foxstudiosscratch gamevui123 gleasongrade greetingsday hacklabasu haskell iw-kaiyun jagoanproperti jilidskripsi joltbusinessfinance juegodepokergratis juegospucca kaeru-festival latestmehndidesigns lestanzediottaviano litemagazines localcommunityhero lustrsazan mariashebets menswheels newwebstechs1 nikkit ootheday oxigenvpn plurfitness prefetial probudgetcarpetcleaning psychicmrsmartin pyaten qvantor rejoignezlogis rexzbot riselayouts ruchin rwxqsgd5 sakaltime shibiaowang shop-bot skrtips spotlesshaven strcoding tetapatrium topselller uneplanteartificielle vipertechcr webtech1223411 wo-kygaming yamaha-mekar yeknava yoybuysheets zenunwa yamaha-mekar jilidskripsi ankertoto ankertoto ankertoto