Building Kits
Lean-To Kit for a Steel Building and What to Order
You have a steel building on order or already standing, and the tractor, the boat trailer or the firewood still has nowhere dry...
Structural estimator and buyer's guide writer
Grant spent over a decade pricing steel building jobs for a regional dealer before he started writing the numbers down for buyers instead of just for contractors. He explains a quote the way he would to a customer standing at his desk, line item by line item.
Building Kits
You have a steel building on order or already standing, and the tractor, the boat trailer or the firewood still has nowhere dry...
Costs and Pricing
You signed the quote, and now the supplier wants a check before anyone cuts a single purlin.
Materials and Specs
Two quotes land on your desk for the same 40x60 shop, and one lists PBR panel while the other lists R panel at a slightly lower...
Building Kits
You paid the deposit, the salesman said "about eight weeks," and now week eleven is ending with no truck in sight.
Costs and Pricing
You got a quote for a steel building, the shell price looked fair, and then a freight line showed up near the bottom that...
Materials and Specs
A steel building with no natural light means running fixtures every hour you are inside, even at noon in June.