Use Cases
Steel Building Dog Kennel Layout and Permit Rules
A woman in my old review district filed for a 40 by 60 steel building and wrote "storage" on the use line.
Permits and code compliance writer
Faye spent nine years reviewing building permit applications for a county office before she got tired of watching good projects stall over paperwork nobody explained clearly. She writes about permits and materials the way she wishes applicants had been told the first time.
Use Cases
A woman in my old review district filed for a 40 by 60 steel building and wrote "storage" on the use line.
Permits and Codes
A man once walked into my office with a 50 by 80 shop that was finished, swept, and signed off structurally, and asked why the...
Maintenance and Repairs
The call I used to get at the permit counter, usually in March, went like this: the roof is leaking, the panels look perfect,...
Use Cases
A man two counties over put up a 30 by 40 shop with a 14 foot eave because the kit salesman told him that was plenty for a...
Permits and Codes
The applications that sat longest on my desk were almost never the hard engineering ones.
Materials and Specs
The call I used to get most often at the county counter went like this.